placeholder header
TransCameron Pipeline

TransCameron Pipeline

The project is interconnected via Venture Global’s TransCameron Pipeline, consisting of approximately 24 miles of 42-inch diameter pipeline.

TransCameron Pipeline received FERC authorization in February, 2019 and extends eastward from the Calcasieu Pass LNG facility to a location near Grand Chenier, Louisiana, where it interconnects with the ANR, TETCO, and Sabine Pipelines. Venture Global Calcasieu Pass has contracted long-term, firm, uninterruptible transport capacity on each of the upstream pipelines which connect TransCameron Pipeline to over 2 BCFD of natural gas supply.

Pipeline Safety

Informational Postings